GMG Tech Engineering Ltd Project

1. Conception and Study of a Green Brickyard intended for the arid zone:

Analyses & Studies:

History, Market research, ground, manufacturing processes, necessary equipment, power consumptions and economic survey.

Technological integrations and Substitutions of the processes:

It’s mainly to substitute the drying and cooking by using innovative technologies. The goal is to design a green brickyard, independent, modern and without Co2 emissions.

 

2. Project “4 VELE”

It is a vertical city project “City Life”. The project is composed of all elements necessary for the daily life of a person, a passenger, a tourist and so on. Indeed it is a multifunctional complex comprising housing, employment, tourism, business, sport and relaxation.

We mention that this project has obtained an Agreement of financing of “300Million€” following the development of a Business plan.

 

3. The Sweet almond oil

It is about the transformation of an agricultural farm of 2600 ha into:

– A field of almond tree on a surface of 2000Ha in order to produce the sweet almond oil.

– A biological agricultural farm of 600 ha.

– Unit oil production

The work is conceptual, technical, technological and economically focused on Biological agriculture, water, energy, processing industry. An action plan complete and coherent was established.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s